Reference documents of the Consolidated Investment Plan (PIC) of the Universal Electricity Access Completion Strategy.
The documents below form the technical and financial basis of the completion phase of universal access to electricity:
- the consolidated SAAUE 2029 report, which includes the Consolidated Investment Plan and the project sheets;
- the list of localities still to be electrified, not covered by ongoing projects, as a spreadsheet and as a Google Earth map layer;
- the technical minimums for solar mini-plants: MC 2.0 specifications and specifications for the AC and AC/DC configurations.
Documents to download
- PDF Universal Electricity Access Completion Strategy to 2029 — consolidated report, Consolidated Investment Plan (PIC) and project sheets 2.6 Mb
- XLSX Localities still to be electrified — detailed list (Reliquat_110826) 846.6 kb
- KMZ Localities still to be electrified — Google Earth map layer (Reliquat_110826) 4.2 Mb
- XLSX Annex 1 — MC 2.0 technical specifications 68.6 kb
- PDF MC 2.0 specifications — AC/DC configuration 550.8 kb
- PDF Solar mini-plant specifications — AC configuration 1.1 Mb